Selections schedule

The custom home selections timeline

Every selection has a deadline: the day the trade that installs it shows up. Missing it means idle crews, rush shipping, or rework — and on a cost-plus build, you pay for all three.

1. Decide early

Lot, foundation type, layout, window and door sizes, and anything that changes the structure or the permit set.

2. Hidden work

Outlet and switch locations, plumbing fixture locations, low-voltage wiring, HVAC, blocking for heavy fixtures — all needed before drywall.

3. Main pieces

Cabinets, appliances, windows, doors, and stairs. Cabinets not picked by drywall can push finishes back by weeks.

4. Finishes

Tile, flooring, countertops, paint, hardware, and lighting fixtures.

5. Upgrades

Optional extras like outdoor kitchens, smart-home features, and specialty rooms.

6. Final checks

Walkthrough items, touch-ups, and verifying what was built matches what was decided.