
Custom Home Building Portal
The construction checklist built for cost-plus custom homes. 56 phases and 868 items, from site preparation to the final coat of paint. One shared source of truth for the homeowner, builder, designer, and architect — so allowances don't creep, decisions don't stall crews, and nothing gets billed twice.
New accounts require a 90-day license key. Invited team members join without their own key.
Phase timeline
Built for the whole build team

Spec every outlet, fixture, and finish from a guided checklist — before your builder asks. Your answers become the spec sheet, so nothing is decided on the fly at job-site prices.

Get a complete, organized spec book instead of scattered texts and emails. See what's decided, mark what's built, and flag changes after install — with a paper trail for every selection.

Review client selections in one place, tied to the exact phase and item. Inspiration photos and product links live next to each decision, not buried in a Pinterest board.
The return on being organized
A mid-build change order typically costs 1.5–3× what the same decision costs on paper. Locking selections before each phase starts is the cheapest insurance on the job.
No more hunting through text threads for 'which faucet did they pick?' Every answer, photo, and link is attached to the item it belongs to — searchable in seconds.
Two-track progress records who decided what and when, and who built it. If a selection changes after install, it's flagged — not argued about at the final walkthrough.
One avoided change order pays for years of organization.
Ripping out a mis-placed outlet run, re-ordering the wrong vanity, or re-framing a niche easily runs $500–$5,000 — each. Deciding it on paper first costs nothing.
Choose from preset options and add notes for every item.
Upload photos and save product links for each item.
Invite your spouse, builder, and architect.
A clean spec sheet to get accurate bids up front.
Cost-plus home building
On a cost-plus contract, you pay actual costs plus the builder's fee, so every late decision, every allowance gap, and every duplicate charge is your money. ShackSTAC lays out every decision ahead of time so the budget you sign is the one you finish with.
Cabinets, tile, fixtures, lighting, and appliances are sorted by phase and decision stage, so each choice is made before the crew that installs it shows up.
Learn moreEnter each item's allowance and selected price. The portal shows what's over or under, per room and for the whole project — in design, not on the final draw.
Learn moreHomeowner, builder, designer, and architect work from the same list. Each decision is stamped with who made it and when, and each build mark with who built it.
Learn moreYou pay the actual cost of labor, materials, and subcontractors, plus a builder fee, set either as a percentage or a fixed amount.
Usually because allowances were set too low, selections came in late, changes added up unnoticed, or charges were duplicated. A full checklist made before construction addresses all four.
A placeholder budget for an item you haven't chosen yet. If your pick costs more, you pay the difference, and on cost-plus you usually pay the builder's fee on it too.
Keep one shared record of every item and decision that every party works from, and check each invoice line against it.
Yes. Allowances and selections drive overruns on fixed-price contracts as well.