ShackSTAC Custom Home Building Portal

Custom Home Building Portal

Every selection, every phase — nailed down before the first board goes up.

The construction checklist built for cost-plus custom homes. 56 phases and 868 items, from site preparation to the final coat of paint. One shared source of truth for the homeowner, builder, designer, and architect — so allowances don't creep, decisions don't stall crews, and nothing gets billed twice.

Start your build

New accounts require a 90-day license key. Invited team members join without their own key.

Phase timeline

  1. Site Preparation
  2. Excavation & Grading
  3. Footings & Concrete Work
  4. Foundation
  5. Backfill & Final Grade
  6. Exterior Walls
  7. Structural & Engineering
  8. + 49 more phases

Built for the whole build team

The homeowner specs it. The builder builds it. Everyone sees the same truth.

Homeowners using ShackSTAC

Homeowners

Spec every outlet, fixture, and finish from a guided checklist — before your builder asks. Your answers become the spec sheet, so nothing is decided on the fly at job-site prices.

Builders using ShackSTAC

Builders

Get a complete, organized spec book instead of scattered texts and emails. See what's decided, mark what's built, and flag changes after install — with a paper trail for every selection.

Designers & Architects using ShackSTAC

Designers & Architects

Review client selections in one place, tied to the exact phase and item. Inspiration photos and product links live next to each decision, not buried in a Pinterest board.

The return on being organized

What one missed selection costs vs. what ShackSTAC costs

Fewer change orders

A mid-build change order typically costs 1.5–3× what the same decision costs on paper. Locking selections before each phase starts is the cheapest insurance on the job.

Hours back every week

No more hunting through text threads for 'which faucet did they pick?' Every answer, photo, and link is attached to the item it belongs to — searchable in seconds.

No more he-said-she-said

Two-track progress records who decided what and when, and who built it. If a selection changes after install, it's flagged — not argued about at the final walkthrough.

One avoided change order pays for years of organization.

Ripping out a mis-placed outlet run, re-ordering the wrong vanity, or re-framing a niche easily runs $500–$5,000 — each. Deciding it on paper first costs nothing.

Try it on your build

Pick your specs

Choose from preset options and add notes for every item.

Inspiration board

Upload photos and save product links for each item.

Shared with your team

Invite your spouse, builder, and architect.

Export for pricing

A clean spec sheet to get accurate bids up front.

Cost-plus home building

Cost-plus gives you open books. We help you read them.

On a cost-plus contract, you pay actual costs plus the builder's fee, so every late decision, every allowance gap, and every duplicate charge is your money. ShackSTAC lays out every decision ahead of time so the budget you sign is the one you finish with.

Lock in selections before the trades arrive

Cabinets, tile, fixtures, lighting, and appliances are sorted by phase and decision stage, so each choice is made before the crew that installs it shows up.

Learn more

See allowance overages the moment you choose

Enter each item's allowance and selected price. The portal shows what's over or under, per room and for the whole project — in design, not on the final draw.

Learn more

One item, one record

Homeowner, builder, designer, and architect work from the same list. Each decision is stamped with who made it and when, and each build mark with who built it.

Learn more

Cost-plus questions, answered

What is a cost-plus home building contract?

You pay the actual cost of labor, materials, and subcontractors, plus a builder fee, set either as a percentage or a fixed amount.

Why do cost-plus homes go over budget?

Usually because allowances were set too low, selections came in late, changes added up unnoticed, or charges were duplicated. A full checklist made before construction addresses all four.

What is a construction allowance?

A placeholder budget for an item you haven't chosen yet. If your pick costs more, you pay the difference, and on cost-plus you usually pay the builder's fee on it too.

How do I avoid being billed twice on a cost-plus build?

Keep one shared record of every item and decision that every party works from, and check each invoice line against it.

Is this for fixed-price builds too?

Yes. Allowances and selections drive overruns on fixed-price contracts as well.